Around the last 20 years thn group has been building across europe. In the following section we present some off our references.
Aarhus Universitets Hospital - Denmark thn group has carried out the complete fassade on N1 und N2, including the erection, 1500 pcs windows, 5000 m2 Paroc sandwichpanels und alu sheets, 3000 m2 ceelings, stairs towers, and external walls with 8 mm Rockpanel. Total investment: DKK 700.000.000,00 Building year: 2013-2017 Investors: Aarhus Kommune |
|
Ikea Rothenburg - Switzerland thn group has carried out the complete fassade construction including sandwichpanels, underlying steel construction, aluminium doors and windows, yellow aluminium cassettes, ecape steel stairs and towers, REI30/60 firesafe post bolt glasconstruction including firesafe sliding doors and outside canopies. The project was complete with a very tight timeschedule. |
|
Ikea Aalborg - Denmark thn group has carried out the complete fassade construction including sandwichpanels, underlying steel construction, aluminium doors and windows, yellow aluminium cassettes, ecape steel stairs and towers, REI30/60 firesafe post bolt glasconstruction including firesafe sliding doors and outside canopies. The project was complete with a very tight timeschedule. |
|
Meat Processing Plant PRIME FOOD thn group a/s has made all work regarding steel constructions and sandwich panels, including complete erection.This 10 000 sq. m redevelopment of an existing meat processing plant is fully compatible with EU standards. Total investment: Euro 30.000.000,00 Capacity: Per year 200.000 pigs and 22 tons of manufactured goods Building year: 1998-1999 Investors: Steff-Holberg, Danske Bank, Globe Meat, Bank in Poland IØ-Fonden and NEFCO Building owner adviser: Epstein Development |
|
Thule air base - Greenland thn group has carried out the complete fassade construction including sandwichpanels, underlying steel construction, aluminium doors and windows, yellow aluminium cassettes, ecape steel stairs and towers, REI30/60 firesafe post bolt glasconstruction including firesafe sliding doors and outside canopies. The project was complete with a very tight timeschedule. |
|
Siemens Wind Power - Denmark thn group has carried out the complete fassade construction including sandwichpanels, underlying steel construction, aluminium doors and windows. Building dimensions: L242 m x B42 m x H14 m Total construction period: 19 weeks Takeover: March 1, 2009 Panels: Total facade claddings, insultated panels and supporting steel construction Panels: 200 mm mineral wool panels Erection period cladding: 9 weeks Contractor: thn group a/s Engineer: Cowi a/s Architects: Cladding dpc contruction a/s The project was complete with a very tight timeschedule. |
|
Agri Nordcold Coldstore - Denmark thn group has carried out the complete fassade construction including sandwichpanels, underlying steel construction, doors and windows. |